Before you buy a Florida home, the work already done on it matters as much as its condition today. A building permit is the record that a project was reviewed and inspected. An open permit is one that never reached its final approval. That means the work may be unfinished, unchecked, or both. This guide explains what an open permit means, what Florida law says about who has to close it, and what to ask before you close.
Why Florida requires a permit before the work starts
Under Fla. Stat. 553.79(1)(a), it is unlawful to construct, alter, modify, repair or demolish a building in Florida without first getting a permit from the local enforcing agency. The Florida Building Code says the same thing in Section 105.1: the owner, or the owner’s authorized agent, must apply and obtain the permit before the work begins.
There are exceptions. Florida lets an owner do work valued under $7,500 on a single-family home without a permit, but that exemption does not cover electrical, plumbing, structural, mechanical or gas work (Fla. Stat. 553.79(1)(g)). A renovation that mixes a $3,000 bathroom refresh with a new panel or a moved wall is not covered by the exemption. Ask whether the permit requirement was met for each trade.
What an open permit means for a buyer
A permit is closed when its requirements have been satisfied, which in practice means the final inspections have passed (FBC 105.5). A permit that never reached final is “open.” The house may look finished, with new drywall, paint and fixtures, and still have a permit that no inspector has signed off.
The timing matters. Under FBC 105.4.1.2, if a permit becomes null and void and no new permit is obtained within 180 days, the building official can require that the work already done be removed. Work counts as in active progress only when it has an approved inspection within 180 days (FBC 105.4.1.3). So an open permit with no inspections for a year or more is a real risk, not just paperwork.
Can you still buy a home with an open permit?
Yes, but you inherit the problem. Florida law protects an arm’s-length buyer for value from a permit penalty caused by the previous owner. Under Fla. Stat. 553.79(17)(a), the local enforcing agency may not deny a permit to, issue a violation to, or fine that buyer solely because a previous owner’s permit was not closed. The agency keeps its rights against the owner and the contractor who is listed on the permit.
In practice, that protection is not a clean title. The work still has to be inspected and closed, and the cost of opening walls, redoing concealed work or hiring a licensed contractor to close the permit falls on the person who owns the house. That is why the open permit should be settled before closing, or priced into your offer.
Who can close an open permit
Florida gives the property owner options (Fla. Stat. 553.79(16)(a); FBC 105.5):
- Keep the original contractor on the permit, or hire a different contractor licensed in Florida, to finish the work and schedule the inspections.
- Act as an owner-builder under the statutes, if the owner qualifies.
- If the permit has expired and the work is substantially complete, close it without applying for a new permit. The work can then be judged under the code in effect when the application was received, unless the contractor got approval for a different method (553.79(16)(b)).
- Ask the local agency to close the permit. It may do so 6 years after issuance even without a final inspection, if it finds no apparent safety hazard (553.79(16)(c)).
The last option is not a cure for a seller. It is a backstop, and you should not count on it when you are buying a house now.
Notice of commencement and the job-site posting
Florida requires a notice of commencement to be recorded and posted on the job site before the first inspection on a permitted project (FBC 105.8, referencing Fla. Stat. 713.135). The permit card or a copy must be kept on site until the project is complete (FBC 105.7). If you find a permit with no inspection history, a missing notice of commencement or no permit card on a visible project, that is a question for the seller and the building department, not a reason to assume the work was done properly.
Termite work has its own record. The code requires a weather-resistant job-site board for treatment certificates (FBC 105.10). It also calls for a permanent termite-treatment sign near the water heater or the electric panel (FBC 105.11). If you see the work but not the sign, ask for the treatment certificates.
What to check before you close on a renovated home
- Ask the seller for every permit on the property. Get the permit numbers and the final inspection results in writing. Ask specifically about the electrical panel, the water heater, the HVAC system, any added bathroom or kitchen, and any room that was converted or enclosed.
- Search the building department for the address. Florida requires local enforcement agencies to post permit application types and the status of received applications on their websites (Fla. Stat. 553.79(1)(b)). Check the county or city building department that serves the property. Do not rely only on the seller’s summary.
- Compare visible work to the permit record. A home inspection is not a permit search. But a new panel, a finished garage, an added room or a remodeled bath that does not match the permit history is a flag. Our inspection period schedule guide covers the timing of the inspection period in your contract.
- Put the permit question in your contract. Ask the seller to close open permits before closing, or to credit you the estimated cost. If the permit cannot be closed before closing, get a written quote from a Florida-licensed contractor during your inspection period so the price reflects the real cost.
- Confirm the inspector’s license. If an inspector or contractor tells you a permit is “not needed” or “already closed,” check their license first. Our guide to verifying a Florida home inspector’s license shows how.
How this matters for a renovation loan
If you are financing a purchase with renovation money, the permit history of the work you plan to do and the work already in place both matter. Ask your 203(k) consultant which projects need permits before you sign a contract. Our explanation of what a 203(k) consultant does and our list of eligible and ineligible repairs are a starting point. For the financing side of an FHA purchase, the FHA loan guide for Florida first-time buyers explains the loan rules.
Frequently asked questions
Can a seller sell a house with an open permit in Florida?
The statutes and code sections we checked do not bar a sale with an open permit. The permit still has to be closed, and the owner is the person responsible for closing it. Treat an open permit as a question to settle in the contract, not as a detail to skip.
Does an open permit mean the work was done illegally?
Not always. It means the permit was not closed. The work may have been done correctly and simply never inspected at the end. Only the building department’s records and an inspection can show whether the work meets the code.
Who is liable for an open permit after I buy the house?
The statute protects an arm’s-length buyer for value from penalties caused only by the previous owner’s unclosed permit (Fla. Stat. 553.79(17)(a)). The agency keeps its rights against the owner and the contractor on the permit. In practice, you may still need to pay to close the permit.
Does a home inspection find open permits?
No. A home inspection looks at the visible condition of the home. It does not search permit records. You can compare what the inspector sees with the permit history you request from the seller and the building department.
About the author
Tariq AbouAdma is a Florida licensed home inspector (HI9899), a HUD 203(k) consultant (A1331) and a real estate professional. Quality Real Estate Inspections serves Orange, Osceola, Seminole, Lake and Volusia counties from 336 Wilshire Blvd, Suite 274-229, Casselberry, FL 32707. Call 321-222-3116 to talk about a property before you make an offer.
For insurance questions on a purchase, see our guide to Florida property insurance for home buyers.