Florida Condo Milestone Inspections: What Buyers Should Check Before Closing

If you are buying a condo in an older Florida building, the seller’s disclosure may not tell you the whole story. Florida law requires a structural check, called a milestone inspection, on many condo and co-op buildings. The results can change the association’s repair plan, its special assessments and your closing timeline. This guide explains what the inspection is, who has to have one, what the report should contain, and what to ask before you sign.

What a milestone inspection is

Florida Statute 553.899 defines a milestone inspection as a structural inspection of a building, including its load-bearing elements and primary structural members and systems. It must be performed by a Florida-licensed architect or engineer, who attests to the building’s structural condition.

A milestone inspection is not a home inspection. It looks at the building’s structure, not the appliances, paint or plumbing inside your unit. The two inspections answer different questions, and a buyer usually needs to know both answers.

Which buildings must have one

The requirement applies to a building that is three habitable stories or more, as determined by the Florida Building Code, and is subject in whole or in part to the condominium or cooperative form of ownership under chapter 718 or 719. The owners must have the inspection done by December 31 of the year the building reaches 30 years of age, measured from the date its certificate of occupancy was issued, and every 10 years after that.

Two details matter for buyers:

  • Coastal buildings may be on a shorter clock. The local enforcement agency can require the first inspection at 25 years for buildings affected by salt water, based on the same certificate-of-occupancy date.
  • Deadlines can be extended, but only for good cause. The local agency may extend a deadline if the owners have a contract with an engineer or architect and the work cannot reasonably be finished in time.

The local enforcement agency must send written notice by certified mail. The first phase has to be completed within 180 days after the owners receive that notice. So a building that has just been notified may be only months away from its inspection report, and the report may be new information for everyone in the building.

Phase one and phase two

The inspection has two phases. In phase one, a licensed architect or engineer visually examines habitable and non-habitable areas of the building, including its major structural components, and gives a qualitative assessment of its condition.

A phase two inspection is required if phase one identifies substantial structural deterioration. Phase two may use destructive or non-destructive testing, and it is only as extensive as needed to confirm whether the building is structurally sound and safe.

The statute’s definition of “substantial structural deterioration” leaves out surface items such as cracks, distortion, sagging, deflections, misalignment, signs of leakage and peeling finishes. Those items still get written up, though. Do not judge the building by the label on the report. Read the engineer’s findings and recommended repairs.

What the sealed report must say

Under the statute, the engineer must submit a sealed report, with a separate summary of the material findings, to the association, to any non-condo owner of part of the building, and to the building official. The report has to meet specific standards. It must:

  • bear the seal and signature (or electronic signature) of the engineer or architect who did the work;
  • state the type and manner of inspection that formed the basis of the findings;
  • identify any substantial structural deterioration, its extent and the recommended repairs;
  • state whether unsafe or dangerous conditions were observed;
  • recommend remedial or preventive repairs for damaged items that are not substantial structural deterioration.

If a report says nothing about unsafe conditions, ask the engineer or the association to confirm that in writing. A report that is silent on a point is not the same as one that clears it.

Reserves, the SIRS and the money question

Florida condo rules also tie reserve funding to a structural integrity reserve study (SIRS) for buildings three stories or more. Under Florida Statute 718.112, the association’s reserve budget must follow the findings of its most recent SIRS, and the statute exempts buildings under three stories. A milestone report can change those numbers, and it can lead to repairs that the association pays for through reserves, special assessments or loans.

That is why a condo buyer should look at the money as well as the building. For financing questions, see our explainer on condo loans in Florida and how reserves and special assessments affect approval.

What to request before you close

Ask the seller, the association or the management company, in writing, for:

  • the most recent milestone inspection report, including the sealed report and the summary of findings;
  • any phase two report, and the repair schedule and contracts that came from it;
  • the written notice from the local building department and the milestone deadline for the building;
  • the latest SIRS and the current reserve funding plan;
  • the current budget and any special assessment notice, with the amounts and due dates;
  • the association’s insurance details, including how loss assessments would be handled.

On insurance, a condo owner’s policy works differently from a single-family policy. Our guide to condo insurance in Florida, HO-6 coverage and loss assessments explains what to check.

Where a home inspector fits

A home inspection covers the systems and components of your unit and the accessible parts of the property, using Florida’s standards of practice. Our guide to what a Florida home inspection must and must not include shows the scope in plain language. Your inspector can flag signs of trouble, such as cracks or water staining, that deserve a question to the association. Only the licensed engineer or architect can answer the structural question.

Timing matters too. If the contract includes an inspection period, plan the milestone document request early, because it may take longer than the period. Our Florida inspection period schedule shows how to plan the days.

Frequently asked questions

Does every Florida condo need a milestone inspection?

No. The requirement applies to residential condo and co-op buildings that are three habitable stories or more. The first inspection is due by December 31 of the year the building reaches 30 years, measured from its certificate of occupancy, unless the local rule sets an earlier age.

Is a milestone inspection the same as a home inspection?

No. A milestone inspection is a structural review by a licensed engineer or architect. A home inspection looks at the systems and condition of the property you are buying, under the state’s standards of practice.

If phase one finds no substantial structural deterioration, is the building cleared?

Not automatically. Phase two is not required in that case, but the engineer must still report any unsafe conditions and recommend repairs for damaged items that are not substantial structural deterioration. Read the full report.

Who should I ask for the report?

Start with the association, because the statute requires the engineer to send the sealed report and summary to it. Ask the seller’s agent to request it in writing, and put a copy of the answer in your file before you close.

This article is general information, not legal advice. Statutes change, and local enforcement agencies may set their own deadlines. Confirm the milestone dates for a specific building with the local building department and the association.


Tariq AbouAdma, Certified Master Inspector, Florida license HI9899 Β· HUD 203(k) Consultant A1331