Lead Paint in Pre-1978 Florida Homes: The 10-Day Test Window and What Your Inspector Won’t Test
If the house you want was built before 1978, federal law requires the seller to tell you what they know about lead-based paint, and it gives you a 10-day window to test for lead before you are bound to the contract, unless you both agree in writing to a different period. Most buyers do not learn this until the paperwork is on the table. This guide explains what the seller must give you, how the 10-day window works, what a standard home inspection does and does not check, and what to do if you are renovating an older home.
I am Tariq AbouAdma, a Certified Master Inspector (license HI9899) with Quality Real Estate Inspections, and I also work as a HUD 203(k) consultant. The age of the house is the first thing that changes the rules, so it is worth checking early.
Which homes are covered
The federal disclosure rules in 40 CFR Part 745, Subpart F, apply to residential property built before 1978. The rule is about the construction date. The condition of the paint does not decide whether the disclosure applies. A pre-1978 house with fresh paint still requires the disclosure, and a house with peeling paint still requires it too.
What the seller must give you
Under 40 CFR 745.113(a), every contract to sell a pre-1978 home must include an attachment with these parts:
- A Lead Warning Statement. It says the property may present exposure to lead from lead-based paint that may place young children at risk, and it says a risk assessment or inspection is recommended before purchase.
- The seller’s statement disclosing known lead-based paint or lead-based paint hazards, or stating that they have no knowledge of any.
- A list of any records or reports the seller has about lead in the house. If there are none, the seller has to say so.
- Your signed statement that you received that information and the federally approved lead hazard pamphlet.
- Your signed statement that you either received the opportunity to test or waived it.
Sellers and agents must keep the signed attachment for at least three years after the sale (745.113(c)). Ask for a copy of it at signing, and keep your own copy.
The 10-day test window
Under 40 CFR 745.110(a), before a buyer is obligated under the purchase contract, the seller must give the buyer a 10-day period to conduct a risk assessment or inspection for lead-based paint and lead hazards. The parties can agree in writing to a different period. The buyer can also choose to waive the opportunity (745.110(b)), and the attachment asks you to say which you did.
Do not confuse this window with your Florida inspection period. They are two different clocks. The standard FR/Bar As Is contract has its own inspection period, which we explain in our day-by-day inspection period plan. Put both sets of dates on your calendar on the day the contract is signed.
What a standard home inspection does not test for lead
A home inspection is a visual review of the house. It can see paint that is peeling, chalking or damaged, especially on windows, doors, railings and other surfaces that rub together. Those conditions go in the report. A visual inspection does not measure how much lead is in the paint, and it does not replace a lead test.
A lead test has to be done by a certified inspector or risk assessor. Under the renovation rule, the certification comes from 40 CFR 745.226 or a state program authorized under 745.324. Ask for the person’s certificate before you hire them.
How lead testing is done
Under 40 CFR 745.82(a), the test methods that count are:
- Paint-chip samples from each painted surface, sent to a laboratory that EPA recognizes for lead analysis.
- An EPA-recognized test kit, used by a certified renovator, following the manufacturer’s instructions.
Either method shows whether a painted component is free of lead at or above 1.0 mg/cmΒ² or 0.5% by weight. Get the written report and attach it to your negotiation. A report that shows the house is clear is useful, and so is one that shows lead, because it tells you exactly which surfaces need work.
If you are renovating an older home
Renovation work done for pay on pre-1978 homes falls under EPA’s Renovation, Repair and Painting (RRP) rule, 40 CFR 745 Subpart E (745.82(a)). That covers many of the repairs buyers finance with an FHA 203(k) loan. The rule has some exemptions, including work on components that a certified inspector or risk assessor has determined are free of lead, or that a certified renovator has tested and cleared (745.82(a)(1)-(3)).
If the work is covered, the contractor’s firm must be EPA-certified, and the crew’s renovators must be certified. The rule requires warning signs, containment that keeps dust inside the work area, and plastic sheeting over the floor at least 6 feet past the work area on interior jobs (745.85(a)). Ask your contractor for the firm’s certificate before you sign. Our guide to FHA 203(k) eligible and ineligible repairs explains which work is financed. If you are weighing the loan options for those repairs, the FHA 203(k) loan guide on our finance site explains the limited and standard versions.
A 10-day checklist for buyers of a pre-1978 home
- Read the attachment at signing. Check the seller’s statement and the list of records. If the seller has old reports, ask for them.
- Decide before the window closes. Test or waive, and make the choice in writing. Do not let the date pass by default.
- Book a certified lead risk assessment early if the house has peeling paint, friction surfaces in poor shape, or young children in the family. Book it as soon as the contract is signed so the results arrive inside the window.
- Combine the lead report with your home inspection. Use both to ask the seller for repairs or credits. Our guide on how to read a Florida home inspection report shows how to sort the findings.
- Get insurance quotes early. An older home can take longer to quote, so an early Florida property insurance quote protects your timeline.
- Keep the signed attachment. You will need it if questions come up later about the disclosure.
What a home inspection does not cover
Lead is only one item outside the standard visual scope. Our guide to what a Florida home inspection does not cover lists the other gaps buyers should plan for, such as inside walls, underground lines and the condition of the foundation below the surface.
Frequently asked questions
Does a standard home inspection test for lead paint?
No. A standard visual inspection notes painted surfaces that are in poor condition, but it does not measure lead. For a lead test, hire a certified inspector or risk assessor, and ask for a written report that names the surfaces tested.
The seller says they know nothing about lead paint. Does that end the matter?
No. The seller still has to give the Lead Warning Statement and the other parts of the attachment. You can still use the 10-day window to test the house.
Do I have to test?
No. The rule gives you the opportunity to test, and you can waive it. Waiving is a choice you make in writing. If the house was built before 1978 and has children or pregnant women living in it, testing is the only way to know what is on the surfaces.
Does the lead rule apply to rentals as well?
Yes. The same disclosure rules apply to lessors of pre-1978 housing (745.113(b)). This article focuses on buyers, but the forms are similar.
What if the test finds lead?
The report tells you which surfaces have lead and their condition. Ask the seller to repair the surfaces in poor shape before closing, or ask for a credit. If the work is renovation for pay, the RRP rule applies to the contractor, as covered above.
Quality Real Estate Inspections Β· Tariq AbouAdma, Certified Master Inspector (HI9899) and HUD 203(k) Consultant (A1331)
Phone: 321-222-3116 Β· 336 Wilshire Blvd, Suite 274-229, Casselberry, FL 32707
